Autocad
A Qualified Mechanical Engineer with extensive knowledge of engineering equipment and software with a career span of 6+ years in Planning, Project & Maintenance of Leach Plant (Copper metal, nickel metal , cobalt metal & various metal salts) , Sulphuric acid plant (100TPD) & Sulfonation plant. I'm committed to providing accurate work with eye for detail. Consistently commended for meeting stringent project deadlines under budget.
About Plant : A brown field project in the villages of Likasi (KItemina) with the capacity to produce 30000 tonnes of copper cathode & 2000 tonnes of cobalt salt per annum. The plant also have a capacity to produce 100TPD of sulphuric acid.
Job Description :
· Involved in detailed re-engineering of Leach plant (Copper cathodes & Cobalt hydroxide) & 100TPD Acid plant
· Managed Drawing office ( Civil , Mechanical , Electrical & Instrument). Drawing engineering plan, review & processing for final approval.
· Pipe rack designing & pipe routing plans.
· Involved in Equipment Erection, Piping, Trial & Commissioning Activities.
· Monitored fabrication activities (tank/pipe racks/ sheds/structural buildings, etc)
· Project tracking/monitoring for on time completion.
· Optimized Budget planning (OPEX) for mechanical maintenance.
· Complete spare planning for equipments.
About Plant : Shalina Resources Ltd and its DRC subsidiary Chemaf S.A.R.L (“Chemaf”), a company specializing in cobalt and copper exploration, mining and processing. The Usoke Plant, first commissioned in 2002, represents Chemaf’s primary processing facility with capacity to produce 31,500 tonnes of copper cathodes and 2,400 tonnes of cobalt salt per annum along with 100TPD Acid plant.
Job Description :
Lead Engineer in following major plant dismantling & reconditioning (equipments) units :
o Crushing & Milling Unit
o Pre Leach VBF (vacuum belt filter)
o Leaching section
o CCD & Solution clarification (Thickeners, tanks, etc)
o Solution Storage & Copper Solvent Extraction (Cu SX)
o Copper Electrowinning
o Cobalt Electrowinning
o Pilot plants dismantling (Cu EW, Co EW, Leach plant)
o SAP 100 (Sulphuric acid plant) Dismantling
o SO2 plant dismantling
· Dismantling of plant with proper tagging & stacking
· Budget planning for dismantling & relocation
· Scheduled dismantling plans & tracking.
· Manpower handling & utilization.
· Project activities monitoring for on time completion
· Reconditioning of Equipments (Gearboxes, pumps, agitator shaft, lantern , blowers, & special process equipments, etc)
· Resolving mechanical issues during project , therefore minimizing idle time to meet the dismantling time frames.
· Spare planning for project relocation.
· Budget plan for maintenance of equipments
· Pilot plant dismantling (Copper electrowinning, Cobalt bench scale project (Cobalt Electrowinning) & Leach plant)
· Material Dispatch & loading of trucks (Approx 1200 Trips)
About Plant : Detergeo chem is a new 5TPH sulfonation plant producing LABSA (linear alkylbenzene sulphonic acid) and AES
Job Description :
· Managing project activities (Equipment Erection, Piping, Commissioning)
· Supervision of work as per drawings ( P&ID, GA, Isometric)
· Study of BOQ followed by making BOM
· Regular follow up of materials from vendors
· Communication and meeting with vendors,contractors,service engineers
· Managing procurement as well as inventory of received material.
About Plant : Nicomet industries was the leading producer of cobalt and nickel sulphate as well as its metals (Nickel cathodes) using the electrowinning process in India.
Job Description :
· Planning and undertaking scheduled maintenance
· Maintaining manpower according to their skills
· Responding to major and minor breakdowns
· Troubleshoot and resolving mechanical issues, minimizing downtime and enhancing productivity.
· Diagnosing faults during predictive maintenance
· Maintaining statistical records.
· Manpower handling.
· Maintaining log records as per audit requirements
· Maintaining spare stock for PR planning.
· Participation in project activities within plant.
Date of Birth : Oct 16 , 1995
Fathers Name: Kuldeep Kumar Tiwari
Mothers Name : Sadhuri Tiwari
Marital Status : Married
Passport No : Z7822111
Blood Group : AB
Autocad
Mircorsoft Package (Excel, Word, PPT)
Mircosoft Project
Project Field : Optimization
Project Title : Manufacturing process parameters optimization using advance optimization techniques
Platform Used : MATLAB
Contribution : Program coding
Description : This project deals with manufacturing process parameters optimization to maximize or minimize the outcome by varying various parameters involved in it by using optimization algorithms. This will provide accuracy and also reduces time span as compared to other time consuming methods like trial and error.